Breaking

Post Top Ad

Your Ad Spot

Tuesday 15 January 2019

Collection Of Bill Of Quantities and Cost Excel Sheets For Total MEP Projects



Description
The nature of this contract is measured unit price contract and the Bill of Quantities (BOQ) shall reflect this fact. The Bill of Quantities (BOQ) is divided into several parts as following:


  • Bill No (A) includes the Water Tank works. 
  • Bill No (B) includes the Booster Station works. 
  • Bill No (C) includes the Piping Yard Works. 
  • Bill No (D) includes the Service Building works. 
  • Bill No (E) includes the Electrical Works. 
  • Bill No (F) includes the Miscellaneous Works. 

BOQ shall be read and construed in conjunction with other Contract Documents.
In these  Post we are provided the bill of quantities BOQ or BQ document Which is very useful for  cost consultant that provides project specific measured quantities of the items of work identified by the drawings and specifications in the tender documentation.

The Following Collection are Provided In these Excel Sheet.
  • BILL OF QUANTITY - HVAC WORKS
  • BILL OF QUANTITY - WATER SUPPLY & DRAINAGE WORKS
  • BILL OF QUANTITY - ELECTRICAL WORKS
  • BILL OF QUANTITY - LOW CURRENT WORKS
  • BILL OF QUANTITY - FIREFIGHTING & FIRE ALARM WORKS
  • BILL OF QUANTITY - LPG WORKS
  • Estimation For Project Overheads
  • Project Cost Evaluation Form (E)'
  • Summary Reports.



Download Link-1
Download Link-2

No comments:

Post a Comment

Post Top Ad

Your Ad Spot

Pages